Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 5 Years |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main Products
PVC Marble Sheet WPC Wall Panel SPC flooring(LVT flooring)
Acoustic Wall Panel Bamboo Charcoal Wood Veneer PU StoneName | Composite ceiling tube |
Profile size | 100x25,40x25, 40x45,50x90 |
Delivery time | Within 15 days for one 20'ctn normally |
HS code | 39259000 or 39189090 |
Packing | Pellet or bulk loading |
Optional Colors | ![]() |
Texture | wood-like texture |
Difference between natural wood and WPC
Characteristic | WPC | Wood | |
Using property | Humid stability | More stable | Will expand after water absorption |
Durability | Long | Short | |
Termite resistance | Yes | No | |
UV stability | High | Low | |
Acid and alkali resistance | High | Low | |
Anti-aging sun | High | Low | |
Maintenance | Painting | No Need | Yes |
Cleaning | Easy | Middle | |
Maintenance cost | No maintenance, low cost | High cost | |
Colors | Can be customized | Just wood color | |
lifetime | More than 10 years | Need to be maintained every 1 or 2 years | |
Environment effects | 100% recyclable, friendly | Will lead to deforestation | |
Installation | Very easy | Easy |
YongHong, established in 2018, has accumulated extensive experience in the field of home decoration. YongHong focuses on the research and development, production, and sales of wood-plastic composite materials, dedicated to providing high-quality decorative solutions for the global market.
Factory
Packaging & Shipping
Packaging Details:
1) Inner packing: Inside pallet is wrapped with a 0.20mm plastic bag.
2) Outer packing: Pallets are covered with carton and then steel tapes for strengthening.
Delivery Time:
15~25 working days after payment, we will choose best speed and reasonable price.
Certification
Our products have passed various certifications, which is a reflection of the careful work of the factory workers and the careful control of our quality control department.
Our high quality products and sufficient certificates can make your import work a more efficient experience!Exhibition
FAQ